Our Flagship Asset

Sage Plain Project

85,590 Acres Land Package

Advanced Permitting

High Quality Resource

Independent studies confirm 771.5M tonnes of Measured, Indicated and Inferred resources with clean, high-grade mineralogy and strong geotechnical support.

Mineral Resource

Measured: 54.3 million tonnes at 41.31% KCl
Indicated: 171.8 million tonnes at 41.37% KCl
Inferred: 545.4 million tonnes at 41.53% KCl

Clean Mineralogy

Less than 1 percent insolubles and 0.01%–0.09% carnallite.

Geotechnical Confidence

Sage benefits from strong geotechnical confidence supported by geological data, gamma ray wireline logs from fourteen historical oil wells, 275 km of 2D seismic interpretation.

Paradox Basin local structural elements map showing the Sage Potash property

Mineral Resource Estimate

October 2026

Cycle 18 MemberAverage Thickness (m)Average KCl Grade (%)In-Place Sylvinite Tonnage (MMT)
MeasuredTotal Measured: 54.3
Upper 187.240.7333.9
Lower 184.342.2720.4
IndicatedTotal Indicated: 171.8
Upper 187.140.88106.8
Lower 184.342.1765.0
Total Measured and Indicated226.1
InferredTotal Inferred: 545.4
Upper 187.141.17336.9
Lower 184.442.11208.5

Total Resource

(NI 43-101)

771.5 MMT

Permitting Advanced

Cross-section showing pilot production well, water well and disposal well

Advanced Permitting

Final Stratigraphic Drill Permits able to be procured shortly.

In 2025: Advanced Permitting for production of 150k-300k tonnes TP/Y operation.

Community & Stakeholder Support

Ongoing outreach programs and environmental studies underpin a socially responsible development plan. Community comment period and cultural studies complete.

Solution Mining Advantages

Low Environmental Footprint

Minimal surface disturbance, with no evaporation ponds or tailing piles, and minimal water and energy requirements.

Energy Efficiency

68 °C formation temperature enables lower cost pregnant solution recovery.

Modular Production

Scale allows for rapid construction and cash flow generations relative to conventional mining.

Safe and Reliable

Avoids the largest safety risk in potash mining - sending people underground.

Next Steps

Pre-Feasibility Study

Advancement toward a Pre-Feasibility Study (PFS).

Development Plan

Refinement of the development plan and cost structure.

Engineering & Production Capacity

Advancement of project engineering and evaluation of production capacity.

Infrastructure & Logistics

Continued progress on infrastructure and logistics.

Subscribe to our Newsletter

Stay updated with the latest information and news.